Rails and Wire

Another successful Train Day. I placed 8 rails – bridging gaps. I connected 6 rails that were already mostly in place. Lots more to do.

I purchased 1200′ (12 spools of 100′) of AWG 24 wire last year and found out that the train requires thicker wire. Dang. Running at 12 volts I was not expecting it would need thick wire. Ah well.

* WPG2 Plugin Not Validated ** WPG2 Plugin Not Validated ** WPG2 Plugin Not Validated ** WPG2 Plugin Not Validated ** WPG2 Plugin Not Validated ** WPG2 Plugin Not Validated *

This entry was posted in Train Day. Bookmark the permalink.

Leave a Reply